This work party was a two fold project. The first objective was to prepare the fishery for the start of the Trout fishing season. The second objective was to gauge what other work would be required at the big work party on Saturday 22nd May.
Both objectives were met fully, with plenty of bankside swims suitable for casting a fly prepared, and a long list made of jobs for the 22nd May.