Although not well attended, just myself and one other member, an enormous amount of work was carried out.
A new fence was installed next to the lift bar entrance to the car park.
Lots of tree limbs were removed from two trees at the rear of the car park. This created parking spaces for a further three cars.
Swims were cut in preparation for the new season as well as a pathway linking the first six swims in section two.
Finally, non-native weed spraying was carried out along section two where required.






















